Artificial Intelligence · 31.07.2026, 08:33 UTC
Why Are GUI Agents Correct but Late? Decode on the Decision-Time Critical Path, Tested with Pre-Compiled Policy Trees
| Schweregrad | info |
|---|---|
| Kategorie | Artificial Intelligence |
| Quelle | arXiv cs.LG ↗ |
| Veröffentlicht | 31.07.2026 UTC |
Sicherheitsmeldung mit Schweregrad noch nicht bewertet. Technische Details im Tab „Originaltext“; empfohlene Schritte in der Checkliste.
arXiv:2607.28399v1 Announce Type: new Abstract: Computer-use agents often fail on transient GUI events because they produce the correct action only after the relevant window has already closed. We identify the main cause as expensive autoregressive decoding on the decision-time critical path. We propose Adaptive Anticipatory Policy Trees (AAPT), which eliminates this delay without modifying the underlying model. During idle screen periods, the same frozen multimodal model constructs a bounded conditional policy tree with observable guards, pre-authorized actions, and branch-specific deadlines. The tree is sized to cover the model's own decoding latency. When an event occurs, a lightweight observer matches change-gated frames to a prepared branch and immediately executes the corresponding action without generating new text. In paired trials with pre-registered endpoints and exact McNemar tests, AAPT improves the success rate from 0.50 to 0.79 within a contested decision window ($p=1.8\times10^{-3}$), while producing no incorrect actions. Both open-loop and predict-and-replan baselines achieve zero success because they still decode during execution. A preparation-time sweep shows that the gain emerges where the latency-based tree-sizing rule predicts, and ablations reveal three key requirements: fast observer decoding, valid tree planning, and accurate branch routing. A pre-registered oracle probe rejects our initial hypothesis and instead points to branch routing as the causal bottleneck. We further reproduce the effect on an independent general-purpose multimodal model …